From an ask to a change that is ready to deploy.
Every change goes through the same five steps, one thin slice at a time. You approve each step before the next starts.
The same steps for every slice.
A slice is a thin, end-to-end piece of a feature that can be released on its own. The alpha starts with the brief and the specifications, and the other steps follow.
| Step | What happens | Standard | Status |
|---|---|---|---|
| Brief | You describe the outcome, or bring a prototype. Sulis turns it into a brief an agent can specify from. | Kept as the record every later step is judged by. | In the alpha |
| Specifications | Sulis cuts the brief into thin slices and writes a specification for each, built on your standards. | Nothing is built until you approve it. | In the alpha |
| Build | An agent builds and validates each slice in your codebase, tests first. | Each requirement has a test, and the platform checks it failed first. | Coming next |
| Review | An independent review, in a fresh context, grades the slice against its specification and applies what earlier reviews found. | Independent of the build, graded by severity. | Coming next |
| CI | Sulis watches your repository's checks. If one fails, it picks the slice up and fixes it. | A partial or stale run never counts. | Coming next |
When all five steps have run for every slice, the feature is ready to deploy to your users.
You decide what lands at every step.
You approve
Each step waits for you. Nothing is built until you approve the specifications, and nothing lands until you approve the result.
You correct
When something is off, you say so and why. The correction becomes a lesson that later slices carry.
You choose the depth
Read every step, or only the ones that matter to you. The evidence is there either way.
Four ways to work with it.
Leave it to Sulis
Sulis proposes each step, and you approve it.
Review at chosen points
You pick the steps you want to read, such as the specifications.
Shape it together
You work on the brief and specifications with Sulis before anything is built.
Have each step explained
Sulis says what it did and why, one step at a time.
We learn how your team works first.
The steps run on your standards, so we write them down with you before the first slice. That takes two to four weeks working alongside your team. See the design partnership.
Become a design partner.
We work alongside your team, write your standards down, and bring back a product tuned to them.
Become a design partner